Battery energy storage systems (BESS) in Romania

We develop battery energy storage projects for industry, site owners and energy infrastructure partners. Nectaria is seeking investors and strategic partners for its BESS programme in Romania.

Energy infrastructure

An energy storage project, engineered for its site

A BESS receives energy, stores it and delivers it later to the client's installation or the grid. At industrial scale, the solution includes batteries, power conversion, controls, protection, grid connection, civil works and a long-term operating plan.

The planned standard configuration for Nectaria's programme is 10 MWh storage capacity / 5 MW target grid export power, with a nominal duration of two hours. Site suitability and final export capacity depend on site and grid studies, technical connection approval (ATR) and applicable approvals.

Three perspectives

A BESS project starts with the actual objective

The same technology serves different needs for an industrial consumer, a site owner and an investor.

Industry

Storage sized around demand

For factories, industrial buildings and sites with variable loads, our analysis starts with the consumption profile, approved connection capacity, critical processes and on-site generation. We assess uses such as peak shaving, increased self-consumption and continuity of supply for defined circuits.

Site owners

Feasibility starts with the land and grid connection

We review the site's legal and technical status, access, proximity to electrical infrastructure, known restrictions and a possible grid connection route. A preliminary assessment does not constitute a contractual commitment.

Investors and strategic partners

Partners for Nectaria's BESS programme

Nectaria is seeking investors and strategic partners for its development programme. The target is a portfolio of 25 projects in Romania; these are not 25 projects already built, permitted or connected to the grid.

Two ways to work together

A clear structure, agreed after qualification

The discussion starts with each party's role, the site and the source of capital. Neither route constitutes a public offer or a promise of results.

Co-investment · co-development

01

Project partnership with Nectaria

Once an opportunity has been qualified, Nectaria and its partner agree each party's contribution, responsibilities, project structure and decision stages bilaterally.

Client · fully funded investment

02

Development and delivery on the client's site

The client proposes a suitable site of their own and fully funds the investment. Nectaria develops and delivers the project within the agreed technical and contractual scope, after the land, grid connection and permitting have been assessed.

From origination to operation

A complete scope, defined by the project contracts

Responsibilities, deliverables and the conditions for each stage are set out in the final contracts following project assessment.

01

Project origination and development

We establish the objectives, site information or consumption profile and the project's initial assumptions.

02

Design and grid connection

We define the electrical architecture and progress the grid connection solution, technical connection approval (ATR) and applicable technical documentation.

03

Supply and integration

We coordinate batteries, power conversion (PCS), energy management (EMS), protection, transformers and manufacturers' communication requirements.

04

Installation and EPC

We coordinate civil and electrical works, logistics, installation and interfaces between the project's equipment. EPC covers engineering, procurement and construction.

05

Commissioning

We carry out inspections, functional tests, configuration and a documented handover of the installation.

06

Operation and maintenance

Technical operation, monitoring and maintenance services are defined in the project's final contracts.

Feasibility requirements

What needs to be confirmed before a decision

A project remains conditional until grid connection, permitting, equipment and documentation have been verified.

01

ATR and grid connection

Available capacity, the technical solution, timing and grid connection costs can change the project's configuration.

02

Consents and permits

Planning, environmental, fire safety and other applicable approvals are checked for each site.

03

Site

Access, topography, ground conditions, easements, safety distances and legal status must be documented.

04

Manufacturers and integration

The configuration depends on firm quotations, warranties, performance and integration requirements confirmed by the equipment manufacturers.

05

Due diligence

The final decision requires technical, legal and financial due diligence, together with contracts defining each party's roles and obligations.

Information for investors

This page describes services and assessment assumptions. It is not a public investment offer, financial recommendation or promise of returns, permits, grid connection, funding or project development. Any cooperation is assessed bilaterally and takes effect only through final contracts, following due diligence and confirmation of technical, legal and commercial conditions.

FAQ

BESS questions

Configuration, services and the conditions to confirm for each project.

What is a BESS?+

A BESS is a battery energy storage system. At industrial scale, it combines batteries, power conversion, control and monitoring, protection, grid connection and safety systems within a complete electrical design.

What does 10 MWh / 5 MW mean?+

It means a target storage capacity of 10 MWh and a target grid export power of 5 MW, with a nominal duration of two hours. Site suitability and final export capacity depend on site and grid studies, technical connection approval (ATR) and applicable approvals.

Have the 25 projects already been built or permitted?+

No. The 25 projects are the target of Nectaria's development programme in Romania. Each opportunity undergoes its own technical, legal and commercial assessment.

How can I work with Nectaria?+

Route 1 is a co-investment and co-development partnership, with contributions and project structure agreed bilaterally after qualification. Route 2 involves Nectaria developing and delivering a project for a client who fully funds the investment on a suitable site of their own.

Which services can Nectaria Solar provide?+

Origination and development, design, supply and integration, installation and EPC, commissioning, operation and maintenance, within the scope and conditions of the final contracts.

What does delivering a BESS project depend on?+

Site feasibility, technical connection approval (ATR) and the grid connection solution, consents and permits, firm manufacturer quotations and terms, and technical, legal and financial due diligence.

Can land be assessed without its owner funding the project?+

Yes. We can carry out a preliminary assessment of a site's technical feasibility and discuss possible forms of cooperation. An assessment is not an offer, a promise of development or a contractual commitment.

Preliminary assessment

Let's discuss your energy storage project

Send us your site details or consumption profile. We will identify any missing information and assess whether there is a technical basis for the next stage.

Battery Energy Storage Systems (BESS) in Romania | Nectaria Solar