Enter the costs from your quotation. We calculate the maximum funding allowed by the caps and the score for that scenario. The result is not a Nectaria offer, AFM approval or funding guarantee.
Funding = the lowest of 75% of total project cost, RON 15,000 and eligible expenditure capped at RON 1,500/kWh. All figures include VAT. The balance is your own contribution; the inverter is paid entirely by the beneficiary.
Contribution score = min(50, 30 × own contribution / AFM funding). Storage score = min(50, 2.5 × kWh). At 20 kWh, only the storage score reaches its cap; this does not guarantee 100 points or funding.
Articles 5, 6, 7 and 19: only expenditure incurred after AFM approval is eligible. Selection depends on scores, eligibility and the session budget. AFM determines the approved amount.