Hinen · Single-phase
LV · LiFePO₄Hinen BP5000P · 4 × 5 kWh
60 / 100 points
- Total with installation
- 20,000 RON
- Requested grant
- 15,000 RON
Catalogue price · stock reconfirmed before order
Selected · configure2026Casa Verde Baterii · Nectaria Solar
Start with 20 kWh, 15,000 lei requested from AFM and a 5,000 lei contribution. Choose your battery and inverter. See the cost and score instantly.

01A project that works for you
Store your surplus by day. Use it in the evening. We start with your contribution and request the maximum permitted funding.
Funding cannot exceed RON 15,000 or capped eligible expenditure.
The final guide requires at least 10 kWh. At 20 kWh, you reach the storage score cap.
Own contribution and battery capacity have equal weight. Solar panel capacity adds no points.
What can funding cover? A new battery, its installation and commissioning, within the guide's limits. A new inverter and its installation are ineligible costs, paid entirely by the beneficiary. The maximum eligible cost standard is RON 1,500/kWh, including VAT.
02Your contribution. Your score.
Choose your inverter and battery. Adjust your contribution. See your score and estimated chance.
Maximum AFM funding
Hinen BP5000P · 4 × 5 kWh
Equipment and price stay the same. When you contribute more, you request less from AFM.
Battery 50/50Contribution 10/50
Contribution: min(50, 30 × 5,000 / 15,000) = 10
Battery: min(50, 2.5 × 20) = 50 AFM formula ↗
Illustrative simulation, not a funding guarantee.
Contribution needed in the simulation: 10,000.01 RON · AFM 9,999.99 RON
High = at least 80% in the selected model. This is not an official AFM threshold.
Moderate competition is selected by default. The 2026 applicant distribution is not yet known. The interval depends on the number and scores of other applicants and tie-breaking.
Assumed programme budget: 400,000,000 RON · 800 simulations / scenario. Eligibility is assumed.
Catalogue price · stock reconfirmed before order
Keep the maximum grant
At 20 kWh you have 50 battery points. Beyond that, contribution and tie-breaking make the difference.
Packages from 20,000 RON including VAT. BMS and combiner calculated by tower count. Protection sizing, cable routes and compatibility are confirmed at assessment.
View battery in the shop ↗Prices checked: 20.09.2026
Your contribution is the difference between the package price and the grant requested from AFM. Reducing the grant changes this ratio without adding batteries or costs to the project.
At 20 kWh or more, 100 points require at least 62.5% own contribution. The AFM request remains within all eligibility limits.
View the AFM formula and PDF guide ↓03Real equipment. Transparent costs.
Three options for each brand and connection. Battery, BMS and installation included.
Packages for existing Hinen and Deye inverters. Solplanet: quote after checking the model.
Hinen
Hinen · Single-phase
LV · LiFePO₄Hinen BP5000P · 4 × 5 kWh
60 / 100 points
Catalogue price · stock reconfirmed before order
Selected · configureHinen · Single-phase
LV · LiFePO₄Hinen BP5000P · 5 × 5 kWh
64.01 / 100 points
Catalogue price · stock reconfirmed before order
Configure this packageHinen · Single-phase
LV · LiFePO₄Hinen BP5000P · 6 × 5 kWh
71.18 / 100 points
Catalogue price · stock reconfirmed before order
Configure this packageHinen
Hinen · Three-phase
HV · LiFePO₄Hinen BH7700A · 3 × 7.7 kWh
70.85 / 100 points
Catalogue price · stock reconfirmed before order
Configure this packageHinen · Three-phase
HV · LiFePO₄Hinen BH7700A · 4 × 7.7 kWh
92.95 / 100 points
Two HV towers · parallel configuration to be confirmed
Catalogue price · stock reconfirmed before order
Configure this packageHinen · Three-phase
HV · LiFePO₄Hinen BH7700A · 6 × 7.7 kWh
100 / 100 points
Two HV towers · parallel configuration to be confirmed
Catalogue price · stock reconfirmed before order
Configure this packagePrices including VAT, checked in the store on 20.09.2026. Estimated standard installation: RON 1,500. Cable routes, extra protection, transport and specialist works are confirmed after assessment. The calculation excludes a new inverter or backup unless selected. Funding, stock and compatibility are checked individually; selecting a package is not an order.
04Understand the difference before choosing
The same package prices. We choose the contribution that reaches the maximum score by reducing the AFM request.
Hinen · 20 kWh
BP5000P · single-phase
50 + 50 points · 62.5% own contribution
Configure this projectHinen · 25 kWh
BP5000P · single-phase
50 + 50 points · 62.5% own contribution
Configure this projectHinen · 30 kWh
BP5000P · single-phase
50 + 50 points · 62.5% own contribution
Configure this projectHinen · 23.1 kWh
BH7700A · three-phase
50 + 50 points · 62.5% own contribution
Configure this projectDeye · 32 kWh
SE-F16 · single / three-phase
50 + 50 points · 62.5% own contribution
Configure this projectDyness · 48.21 kWh
PowerBrick Plus · single / three-phase
50 + 50 points · 62.5% own contribution
Configure this projectGuide formula · Article 19
CP = your contribution in RON. AFM = requested funding in RON.
At 20 kWh you earn all 50 storage points.
Total score = contribution points + battery points. At 20 kWh or more, a 62.5% share of the project gives 100 points: 30 × 62.5 / 37.5 = 50.
We reproduce the printed equation in Article 19(4): the denominator is AFM funding, although the introductory sentence mentions total project value. The final score is calculated by the AFM application.
Applications are ranked by score. Ties are broken by higher own contribution, then greater capacity, then AFM submission date and time. Storage above 20 kWh can help with tie-breaks, but it should also make sense for your home.
Mathematical table for a requested RON 15,000 grant. These are not battery prices. Eligible expenditure, total cost and compatibility requirements must also be satisfied.
| Contribution | 10 kWh | 12 kWh | 14 kWh | 16 kWh | 18 kWh | 20 kWh |
|---|---|---|---|---|---|---|
| 5,000 RON | 35 | 40 | 45 | 50 | 55 | 60 |
| 7,500 RON | 40 | 45 | 50 | 55 | 60 | 65 |
| 10,000 RON | 45 | 50 | 55 | 60 | 65 | 70 |
| 12,500 RON | 50 | 55 | 60 | 65 | 70 | 75 |
| 15,000 RON | 55 | 60 | 65 | 70 | 75 | 80 |
| 17,500 RON | 60 | 65 | 70 | 75 | 80 | 85 |
| 20,000 RON | 65 | 70 | 75 | 80 | 85 | 90 |
| 22,500 RON | 70 | 75 | 80 | 85 | 90 | 95 |
| 25,000 RON | 75 | 80 | 85 | 90 | 95 | 100 |
From calculations to a working system
Your final quote lists the exact equipment, capacity, included works and separate costs. You can compare equivalent systems and choose where to invest.
Get a quote for my home→Model, datasheet, warranty and operating conditions. We check the inverter–battery combination before quoting.
Cable routes, protection, BMS and communication. If you want backup, we separately define the circuits and available power.
Alba, Cluj, Hunedoara, Mureș, Sibiu and Timișoara. We work through the same configuration from assessment to commissioning.
Key specifications
BP5000P
BH7700A
SE-F16
PowerBrick Plus
Inverter power is selected for the electricity supply and consumption. We validate the model, firmware and BMS communication before ordering. The quoted product's certificate defines its warranty; AFM eligibility checks include warranty and datasheet-declared cycles.
All equipment, warranties and documentation ↗05Compatibility & installation
Distance to the inverter, temperature and the route to the distribution board affect the design. Checking the location is part of the project, just like selecting capacity.
Full guide with five installation diagrams (Romanian)Educational diagram. Cable routes and distances require an on-site assessment.
We check the model, LV/HV, firmware and battery communication. The brand alone does not establish compatibility.
Utility room, garage or outdoors: we follow equipment specifications, service access and environmental requirements.
Storage does not automatically power the whole home during an outage. We select priority circuits and the required protection.
06Ready before applications open
The programme is for individual prosumers. Check outstanding tax obligations, the consumption site's status and the absence of double funding. This checklist helps you prepare; the official guide sets the full requirements.
Your identity document and the funding application completed for the AFM session.
ANAF and local tax clearance certificates; also check the requirements for the project address if it differs from your home address.
The prosumer contract and grid connection certificate for the consumption site.
In the applicant's name, issued no more than six months before applying, as required by the guide.
07Next steps
Send your inverter details, location and consumption. We discuss the right capacity and any changes needed.
Receive the configuration, itemised costs and funding options. Choose a contribution you can afford.
Follow the official schedule and check your documents. A Nectaria enquiry does not replace the funding application.
Choose a validated installer within the guide's deadline. We arrange installation, testing and commissioning after funding approval.
Start with your project
Tell us where your home is and what system you have. We'll follow up with the technical questions needed to build a quote around your home.
Alba · Cluj · Hunedoara · Mureș · Sibiu · Timișoara
Preliminary enquiry, without reserving an AFM place. Funding and compatibility are checked individually. Do not send identity or tax documents through this form.
Project details · 4 steps
About funding, batteries, compatibility and what happens next.
The final guide has been published: Order No. 1,904/2026, Official Gazette No. 775 of 14 September 2026. AFM sets and announces the application timetable; publication of the guide does not mean applications are open. Nectaria's form is for preliminary contact only.
The contribution score is 30 × own contribution / AFM grant, capped at 50 points. At the same total price, requesting less funding increases your contribution and improves the ratio. Compare the extra out-of-pocket cost carefully; the score does not guarantee approval.
No. Ties are broken by own contribution, then storage capacity and finally the date and time of the application in AFM's system. The number of applications and available budget matter. The simulator shows hypothetical scenarios, not a probability validated against this session's applications.
Not automatically. We check the exact model, battery voltage, BMS communication, firmware and the manufacturer's compatibility list. If a new inverter is needed, its purchase, installation and commissioning are paid entirely from your own contribution.
Previous funding does not automatically exclude a new storage project. All guide requirements must be met and the same expenditure cannot be publicly funded twice. We review the project's history and documents before confirming a solution.
A storage system must have at least 10 kWh capacity and use lead-free technology (Li-Ion, LiFePO4, Na-Ion or equivalent). Lead-acid batteries are ineligible. The system must be new and compatible, with at least a five-year warranty, 5,000 cycles and a BMS, as required by Article 16. Automatic charging from surplus PV generation and component certification must also be checked.
In Alba, Cluj, Hunedoara, Mureș and Sibiu counties, and in the city of Timișoara. We check the address, installation conditions and team availability for each project. The form is a preliminary enquiry, not an official AFM application.
Not if you intend to claim funding. Under the final guide, only expenditure incurred after funding approval is eligible, and installation must be carried out by an AFM-validated installer meeting the guide's ANRE requirements. You can prepare the documents and system design in advance.
Our main inverter brands are Hinen, Deye, Solis and Solplanet. We select the model based on the grid connection, PV array power, compatible battery and required backup functions. Our storage options include Hinen, Deye and Dyness. Depending on the project, our full portfolio also includes Fronius, Huawei, Victron, BYD and Solplanet batteries.
As part of Nectaria's standard offer: a 10-year warranty on selected Hinen, Deye and Solis inverters and Hinen, Deye and Dyness batteries, per the warranty certificate of the delivered model. Installation, connection and operating conditions, together with performance limits, must be checked in the certificate. For Solplanet, the term is confirmed in the offer and certificate for the selected model.
Solis is included in BloombergNEF's Tier 1 list, according to the manufacturer's Q1 2025 announcement. Globally, Solis ranked 3rd by PV inverter shipments in 2024, according to Wood Mackenzie's market share report. Third place refers to 2024 shipments, not a general quality ranking or all subsequent rankings.
Declared technical cycle life: Hinen B8900M-HA — 8,000 cycles; Deye SE-G5.1 Pro-B — ≥6,000; Dyness PowerBrick 14.336 kWh — ≥8,000. These figures depend on the model and test conditions; they are not a cycle count guaranteed by the 10-year warranty. The performance warranty may have total energy throughput and remaining-capacity limits, as specified in the certificate. Brand, warranty and cycle count do not guarantee AFM eligibility; we assess every project.